Skip to content
Completed grey composite deck built along the full rear elevation of a brick ranch house

Deck BuilderCary, North Carolina

Built outside.
Built like the house.

Deck Builder in Cary, NC

A deck is a structure before it is a surface. We build the framing, the stairs and the connection to the house — then lay the part you actually walk on.

TREX Deck · Composite Deck Build · Completed

TREX Deck

Bare ground to finished deck.

The same yard, photographed through the build. Four frames, no styling.

Bare graded soil across the rear yard of a brick ranch house before any deck construction
01 — Existing
Pressure-treated lumber laid out on the cleared ground beside the house before framing begins
02 — Set out
Pressure-treated joists framed across the deck footprint against the rear wall of the house
03 — Substructure
The completed composite deck spanning the same rear elevation, with fascia and picture-frame border
04 — Finished

Below the Surface

Most of a deck is the part you never see.

Decking boards are the last day of the job. Everything that decides how long the deck lasts happens before them.

  1. Ground & grade

    What the deck sits on, how water moves across the site, and whether the ground needs clearing or regrading before anything is set.

  2. Support & framing

    Posts, beams and joists in pressure-treated lumber. This is the part that determines whether a deck feels solid underfoot in ten years, and it is entirely invisible once the surface goes down.

  3. Connection to the house

    How the deck meets the building, and how that junction is flashed and detailed so water is directed away from the structure rather than into it.

  4. Decking surface

    Composite or timber, laid out so boards run the way the space reads best, with a border detail where the design calls for it.

  5. Stairs & railings

    Stair runs set out to land properly on grade, and railings built as part of the structure rather than attached to it as an afterthought.

  6. Transitions

    Where the deck meets a patio, a path, a retaining wall or the lawn. Getting these right is what stops a deck looking like an object dropped in the yard.

Two Starting Points

Building new, or replacing what is there.

These are different jobs with different unknowns, and it is worth being clear which one you have before comparing quotes.

New build

Nothing there yet

The ground governs everything. Clearing, grade and where the deck can sit relative to the house and the fall of the yard are settled first, and the structure is designed around that rather than around a shape drawn on paper.

  • Site cleared and graded
  • Structure set out from scratch
  • Height, stairs and access designed together
  • Transitions to lawn, patio or path planned in

Replacement

Something is already there

The first question is what can stay. Sometimes posts and framing are sound and only the surface and railings need replacing; sometimes the substructure is the reason the deck is failing. That gets assessed on site rather than assumed either way.

  • Existing structure assessed before pricing
  • Sound framing kept where it genuinely is sound
  • Substructure replaced where it is not
  • Ledger and house connection re-detailed

Outdoor Living

Decks are usually part of something larger.

Screened rooms, porches, retaining walls and the ground between them. Built together, the levels and drainage only have to be solved once.

Screened three-season room enclosed on the rear of a single-storey home, with the new deck and patio in front
3 Season Conversion · Enclosed room
Inside the finished screened room: striped outdoor seating, a dark finished ceiling with a fan and string lights
3 Season Conversion · Interior
Timber deck completed above a segmental block retaining wall in a wooded rear garden
Retaining Wall & Hardscape · Deck
  • New deck construction
  • Deck replacement
  • Composite decking
  • Timber decking
  • Screened & three-season rooms
  • Porches & pergolas
  • Stairs & railings
  • Retaining walls & hardscape

Cary & Southern Wake County

Every yard argues back.

Decks are shaped by the ground more than by the plan. How far the yard falls away from the house decides how much structure sits underneath, where stairs can land, and whether you end up with one level or two.

Drainage matters just as much. Water moving across a site has to keep moving once there is a deck over part of it, and the point where the deck meets the house has to shed water away from the building rather than trap it against the wall.

Access is the practical constraint people forget. Getting lumber, equipment and concrete into a rear yard through a side gate changes how a project is staged, and it is worth knowing before the schedule is written.

Requirements vary by property and scope, so we confirm what applies rather than assuming. We build throughout Cary and Southern Wake County and regularly across Apex, Holly Springs, Fuquay-Varina, Morrisville and the wider Triangle.

Existing raised timber deck carried on posts above a sloping lawn at the rear of a house

Park Sunroom · The raised deck as we found it

Materials

Three boards, three trade-offs.

We build in pressure-treated timber, composite and PVC. None of them is the right answer for every deck — the choice follows how exposed the site is, how much upkeep you want, and how you want it to look in ten years.

Pressure-treated wood

The traditional deck board, and still the most common. Real timber, worked and fixed conventionally, with the lowest material outlay of the three.

Appearance
Natural grain that weathers and moves. Takes stain, so the colour can be changed later.
Maintenance
The highest of the three. Expects periodic cleaning, and re-staining or sealing on a recurring cycle to hold water out.
Longevity
Treated to resist rot and insects. Service life depends heavily on whether the maintenance actually happens.
In use
Stays cooler underfoot in direct sun than most dark synthetic boards. Can splinter and cup as it ages.
Suits
Homeowners who want real timber, are comfortable maintaining it, and want the lowest material outlay at the start.

Composite

Wood fibre and plastic combined into a board that does not need sealing. Higher material cost than timber, and much less ongoing work.

Appearance
Consistent colour and a repeating manufactured grain. A wide range of colours and finishes, chosen up front and fixed thereafter.
Maintenance
Cleaning rather than refinishing. No staining or sealing cycle.
Longevity
Resists rot, splitting and insects. Capped boards resist staining and fading better than uncapped.
In use
Darker boards absorb heat and can get hot in full sun. Does not splinter.
Suits
Homeowners who would rather not maintain a deck and want a consistent, settled appearance.

PVC

Fully synthetic, with no wood content at all. The most moisture-resistant of the three and the lightest underfoot.

Appearance
Manufactured finish, generally the most uniform of the three. Colour and texture options are chosen at specification.
Maintenance
The lowest. Washing only — nothing to seal or refinish.
Longevity
No wood content, so nothing in the board itself to absorb water or rot. Strong resistance to moisture and staining.
In use
Lighter than composite. Like any synthetic, colour and surface texture affect how warm it gets in direct sun.
Suits
Damp or heavily shaded sites, poolside and other wet locations, and homeowners prioritising moisture resistance and minimum upkeep.

Railing is a separate decision from decking and does not have to match it. We will walk the site, look at exposure and drainage, and tell you which of the three we would build on your particular yard.

Permits & code

What a deck has to satisfy.

Decks are permitted, inspected structures. The parts that matter most are the ones covered up once the boards go down.

  1. Permits

    Deck construction is generally permitted work. We prepare and coordinate what the jurisdiction requires, and the review and inspection schedule belongs to them rather than to us.

  2. Footings

    Footings must reach below the frost line and be sized for the load carried. Depth and diameter follow the structure above and the ground below, and are inspected before anything is poured over them.

  3. Ledger attachment

    Where a deck attaches to the house, the ledger connection is the most safety-critical detail in the build. It has to be fastened into sound structure with the correct fasteners, and flashed so water cannot get behind it.

  4. Guards and handrails

    Above a defined height a guard is required, with limits on opening size and a minimum resistance to load. Stairs carry their own handrail and graspability requirements.

  5. Structural connections

    Post-to-beam, beam-to-joist and lateral connections use rated hardware rather than fasteners alone. This is what stops a deck racking or separating from the house under load.

  6. Inspections

    Permitted decks are inspected at defined stages — typically footings and framing — before the decking surface covers the structure up.

Cost

What moves the number.

Two decks of the same square footage can be very different builds. These are the factors that separate them.

  1. Size and shape

    Area sets the framing and decking quantity. Angles, curves and multiple levels add framing complexity beyond what the square footage suggests.

  2. Height above grade

    The single most underestimated factor. A deck a step off the ground and an elevated deck at second-floor level differ in footing size, post structure, bracing and guard requirements.

  3. Decking material

    Pressure-treated, composite and PVC differ in material cost, working time and fixing method. See the material comparison above.

  4. Substructure

    Joist spacing, beam sizing and post spacing follow the loading and the decking material. Some composite and PVC boards require tighter joist spacing than timber.

  5. Footings and ground

    Footing depth and diameter, and what the ground is. Rock, fill, water and slope all change the groundwork.

  6. Stairs

    Stairs are disproportionately involved relative to their size — stringers, treads, guards, handrails and a landing at the bottom.

  7. Railing

    Timber, composite, metal or cable, and how much of the perimeter needs it. Railing is often a larger share of a deck budget than expected.

  8. Roofed or screened structures

    A screened porch or covered deck is a roofed structure with its own framing, roof tie-in and enclosure. It is a different build from an open deck.

  9. Site access

    Whether materials and equipment can reach the build, and how far everything has to be carried.

  10. Removing an existing deck

    Tear-out and disposal, and whether the existing footings and ledger can be reused or have to be replaced.

Schedule

What decides how long it takes.

Deck schedules are set by complexity, ground conditions and the inspection stages along the way.

  1. Size and complexity

    A simple ground-level deck and an elevated screened structure are different builds on different schedules.

  2. Permits and inspections

    Deck work is generally permitted, with footing and framing inspections before the surface goes down.

  3. Footings and ground conditions

    What is found when the holes are dug. Rock and water both change the approach.

  4. Material availability

    Specific composite and PVC lines, colours and railing systems are ordered rather than stocked.

  5. Weather

    Concrete for footings and exterior framing are both weather-dependent.

  6. Removing what is there

    Tear-out and disposal happen before the new build begins.

Decks sit at the junction between the house and the ground, which is why they rarely arrive alone. Footings, patios and steps are concrete work; a screened or roofed structure is closer to a home addition than to an open deck, and is built to the same standard. The same team handles both.

Questions

Before anything is set.

More general questions are answered on our frequently asked questions page.

Clients

What people say about this work.

  • Art and his team at Rare Raleigh Restoration built this amazing covered roof above our deck. The team is very professional. They helped with the design and approval process. Great work. I highly recommend for construction projects in the Raleigh/RTP area.

    Denis C.via Google
  • Artur has done a couple of jobs for me.. Replace patio doors and resurface the deck. Both jobs were done timely and professionally. I am very happy with both jobs and will use him in the future. Highly recommended!

    Scott A.via Google

Get Started

Planning a
deck build?

Tell us what you want to use the space for. We will look at the grade, the drainage and how the deck meets the house, then scope the structure properly.

Sunroom addition mid-construction with exposed vaulted framing, skylights and installed glazing — Miroslav Sunroom
Call NowGet an Estimate