Whole Home RemodelingCary, North Carolina

A house is
one system.

Whole Home Remodeling in Cary, NC

Renovating several rooms is not several projects. Scope them together and the decisions stay connected; scope them separately and you pay twice to discover they were never independent.

Cabarrus Custom Flip · Mid-Build

Renovated kitchen with a granite-topped island, bar seating and stainless appliances
Renovated open living area with exposed beams and refinished wood floors
Renovated bedroom with crown molding, a desk and two windows
Renovated bathroom with a tiled shower surround, vanity and framed mirror
Covered outdoor seating area with string lighting at the rear of the renovated house

Interdependence

Change one thing, and you have changed three.

This is the whole argument for running a renovation as one project. Each decision on the left looks self-contained. None of them are.

Open a wall between two rooms
Structure has to carry the load a different way, flooring has to run through, ceilings and trim have to line up, and lighting across both rooms usually needs re-planning.
Move the kitchen sink or add an island
Waste and supply move with it, which means opening the floor — so flooring, and sometimes the ceiling below, join the scope.
Add or relocate a bathroom
Drainage has to reach the stack with the right fall, venting has to be resolved, and the rooms below or beside it are affected by the runs.
Choose a continuous floor finish
Subfloor levels between older and newer parts of the house have to agree, which can mean levelling work long before any flooring is ordered.
Replace or resize windows
Framing, headers and exterior finish all change, and interior trim details have to be decided against the new openings.
Reconfigure heating and cooling
Duct routes need somewhere to go — usually through the same ceilings and chases the plumbing and electrical want, so all three get planned together.

Scope

What a whole-house scope covers.

Not every project includes all of it. What makes it whole-home is that these are planned against each other rather than one at a time.

  1. Layout & structure

    Walls opened or moved, rooms reproportioned, and the load paths that allows re-established. On a whole-house scope this is worth resolving first, because everything downstream is measured off it.

  2. Kitchen

    Usually the largest single room scope in the project, and the one that most often drives changes to adjacent spaces.

  3. Bathrooms

    Often more than one, and frequently on different floors — which makes their drainage and venting part of a single house-wide plan rather than separate problems.

  4. Plumbing, electrical & HVAC

    Coordinated across the whole house at once. Doing this room by room is where whole-home projects usually go wrong and get expensive.

  5. Doors & windows

    Replacement or repositioning across elevations, which ties interior layout decisions to the outside of the house.

  6. Flooring & finish

    Running continuously through the house rather than stopping at old thresholds. Continuity is what makes a renovated house read as one house.

  7. Exterior & envelope

    Siding, roofing and exterior work where the scope reaches outside — sometimes the reason a project became whole-house in the first place.

  8. Sequencing & site management

    One schedule, one point of contact, one set of trades held in order across every room in the scope.

Cabarrus Custom Flip

A whole house, taken back and rebuilt.

This was structural work before it was a finish job — the house sheathed and reframed, then every room rebuilt behind it.

The house mid-renovation, sheathed in OSB with window openings cut and the roof structure in place
Reframed & sheathed
Worker on a ladder against the sheathed two-storey elevation during the renovation
Exterior envelope
Completed exterior with a covered front porch and new siding
Completed exterior
Finished stair landing with handrail and painted trim
Circulation
Finished open living area with exposed beams and refinished floors
Living area
Finished bathroom with a tiled shower surround and vanity
Bathroom

Sequence

The order decisions have to be made in.

On a single room you can improvise. Across a whole house, order is most of the job.

  1. 01

    Existing conditions

    Walking the whole house before scoping any single room — how it is framed, where services run, and what previous work left behind.

  2. 02

    Whole-house scope

    Everything in the project defined together, in writing, so decisions in one room are made knowing what they cost elsewhere.

  3. 03

    Dependencies resolved

    The decisions that constrain other decisions settled first — structure, drainage routes, floor levels — before finishes are selected.

  4. 04

    Strip-out & structure

    Demolition across the scope, then structural alterations and any repair the house turns out to need once it is open.

  5. 05

    Rough-in across the house

    Plumbing, electrical and HVAC run as one coordinated exercise rather than trade by trade, room by room.

  6. 06

    Close up & finish

    Insulation, drywall, then flooring, joinery, tile, trim and paint carried through the house so materials and details stay consistent.

  7. 07

    Completion

    Punch list closed out across every room in the scope and the finished house walked with you.

Cary & Southern Wake County

Houses carry their own history.

Most houses we open up across Cary and Southern Wake County contain work from more than one era. A kitchen redone at some point, a bathroom redone later, a wall moved by someone whose reasoning is no longer obvious. Each of those left something behind.

On a single-room project you can usually work around whatever turns up. On a whole-house scope you meet all of it at once — which is an argument for looking at the entire house before pricing any part of it.

That is also the advantage. With the house open, floor levels can be reconciled, service runs rationalised and layout decisions made against each other instead of in sequence over several years of separate projects.

Requirements and approvals vary by property and scope, so we confirm what applies rather than assuming. We work throughout Cary and Southern Wake County and regularly across Apex, Holly Springs, Fuquay-Varina, Morrisville and the wider Triangle.

Cost

What moves the number.

Whole-house scopes vary more widely than any other kind of project, which is exactly why a category figure is unhelpful. These are the factors that decide it.

  1. How much of the house

    Room count and floor area set the baseline, but which rooms matters more — a kitchen or a bathroom carries far more services, structure and finish than a bedroom of the same size.

  2. Structural change

    Removing walls, changing openings, altering floor levels or reworking the roof structure. Layout changes on paper become structural work in practice.

  3. Systems replacement

    Whether plumbing, electrical and HVAC are being extended or replaced across the house. On older properties, whole-house rewiring or repiping is often the right decision while walls are already open.

  4. Age and condition

    Older houses hold more unknowns and more work that has to be brought up to current standard once it is exposed.

  5. Exterior and envelope

    Roofing, siding, windows and insulation. Frequently the right time to address these is while the interior is already stripped.

  6. Level of finish

    The same layout can be finished to very different standards. Across a whole house, finish selections compound.

  7. Hidden conditions

    A whole-house strip-out exposes more than a single-room project. Previous alterations, water damage and undersized structure are found across the property rather than in one room.

Schedule

What decides how long it takes.

A whole-house schedule is assembled from the scope rather than estimated against a type of project.

  1. Scope

    Whole-house scopes vary more than any other kind of work. What is included decides the schedule, and the schedule is built from the scope rather than estimated against a category.

  2. Sequencing across rooms

    Rough-in happens across the whole house before anything closes up. Trades work the property in passes rather than finishing one room at a time.

  3. Inspection stages

    Structural, rough-in and final inspections gate the next phase of work.

  4. Material lead times

    Cabinetry, windows, doors, tile and flooring are ordered. Across a whole house there are more long-lead items to coordinate.

  5. Occupied or vacated

    Work in an occupied house is phased around the household, which changes how the sequence runs.

  6. What the strip-out reveals

    The larger the exposed area, the more likely something changes the plan.

Most whole-house scopes are really a kitchen and one or more bathrooms with everything between them brought up to the same standard, and many of them end up including an addition once it becomes clear the existing footprint is the actual constraint. One team holds all of it.

Questions

Before the scope is set.

More general questions are answered on our frequently asked questions page.

Clients

What people say about this work.

  • Re did my master bathroom and the finished results were incredible. Art and his team pay attention to every detail and make sure everything is up to code and beautiful. Highly recommend.

    Brenna M.via Google
  • When my roof developed several leaks I called 3 roofers for estimates. They all told me I needed a new roof. When Art examined my roof he said the shingles were still in excellent shape, he just needed to repair the leaks. My total cost was less than what the roofers were going to charge and my cost included all repairs caused by the leaks. All of Art’s team were hard working, skillful and reliable. Since the roof’s repairs I’ve hired Art for several other jobs. In all I got to benefit from his painter, electrician, plumber and carpenters. I will continue to rely on Art and his team and I have recommended him to my friends.

    Gilroy Z.via Google

Get Started

Renovating more
than one room?

Tell us what you are hoping to change. We will walk the whole house, work out which decisions constrain the others, and scope it as one project.